Renovation and Upgrading of GMP Facilities - Live Online Training
15/16 November 2023
Course No. 20712
Speakers
Nikolaus Ferstl
Facility Engineering Services
Dr Jean-Denis Mallet
Former Head of the Pharmaceutical Inspection Dpt. AFSSAPS
Dr Johannes Krämer
CSL Behring
Objectives
This course aims at showing GMP-compliant layout and state of the art clean room technology for GMP production areas, which have to be built in existing manufacturing premises. Next to Project management, the securing of the GMP status of the ongoing manufacture during the construction work is a main topic of this course.
Background
The number of new factory buildings in the pharmaceutical Industry in Europe decreases while upgrading and renovation of existing manufacturing sites is getting more and more relevant. Regardless of whether the upgrade is done in order to extend the facilities’ capacity or whether it was necessary due to GMP issues: upgrading is much more challenging than construction in the Greenfield. For example, the existing infrastructure of the building has to be taken into account, although the existing documentation is most often not complete. Nevertheless the users’ requirements for layout and process flow have to be fulfilled as well as the demands from authorities with regard to the cGMP requirements.
Another common issue is that the actual state is differing from the documented status. And, also quite frequent, the available space is restricted, and bringing in new equipment is sometimes tricky.
But one of the biggest issues and most important differences to construction on the Greenfield is the ongoing manufacture in the existing building. It is unavoidable to take measures to secure the manufacturing area from the parallel construction work and dust and from the uncontrolled access through foreign workers. Moreover, it has to be proven that construction work had no influence on the quality of the batches.
The existing personnel and material flow also has to be considered. For example, bringing in raw materials can possibly be a problem during the construction phase.
Target Group
This course is targeting professionals responsible for the planning and realisation of upgrading and refurbishment projects. It further addresses engineers and project mangers from Pharmaceutical companies as well as from engineering companies.
Technical Requirements
We use Webex for our live online training courses and webinars. At www.gmp-compliance.org/training/online-Training-technical-information you will find all the information you need to participate in our events and you can check if your system meets the necessary requirements to participate. If the installation of browser extensions is not possible due to your rights in the IT system, please contact your IT department. Webex is a standard n
Programme
Basic Requirements for Pharmaceutical Facilities Before starting renovation of an existing facility or doing a GMP upgrade, it is important to know what today’s cGMP requirements for sterile and non-sterile facilities are.
Layout, air-locks, personnel and materials flow
HVAC Systems
Ceiling, walls & floor (cleanability & persistence) – assignment of different systems to the clean room classes A-D (E)
Barrier systems vs. clean room class A
Clean media
Equipment
Gap Analysis, Risk Assessment, and Planning
Definition of Project Targets
Guidelines and Cleanliness classes
Approach with non-sterile dosage forms
Typical project model
Project Management
How Authorities consider Facility Modifications?
What are the regulatory expectations before starting construction work?
How to document the change file from a technical and regulatory point of view ?
Communication with the authority in charge
Implementing the changes & modifications
The real World – Dealing with poorly documented Facilities/Systems
Clarify the feasibility of a rebuild
Preparation and processing of missing documentation
Involvement of authorities and Consultants
Authority documentation
Risks
Measures for protecting the ongoing Manufacture
Protection of floor, ceiling and walls
Protection of bulk and finished products
Protection from dust
HVAC
Handling external workers, access control, Training
Material and personnel flow during the construction time
Monitoring and documentation
Case Study: GMP-Upgrade at CSL Behring: Upgrading of a Manufacturing Area to Clean Room class C The premises of CSL Behring in Marburg did not meet the actual GMP requirements. Therefore process equipment, HVAC System and the clean rooms themselves underwent a GMP upgrade. Another aim was to optimise the whole flow of the process. All was done during ongoing manufacture under GMP conditions.
Starting situation and objective
Project plan, milestones, timelines
GMP requirements
HVAC
Clean room interior
Specifics for renovation work during ongoing manufacture
Lessons learned
Lessons learned – Practical Experience with Layout, HVAC Systems, Utilities
Initial Situation and Objectives
Definition of Requirements
Development of layout and zone Concept
Structural Measures
Concept development technical building services
This course is part of the GMP Certification Programme "ECA Certified Technical Operations Manager" Learn more
This training/webinar cannot be booked. Send us your inquiry by using the following contact form.
To find alternative dates for this training/webinar or similar events please see the complete list of all events.
For many training courses and webinars, there are also recordings you can order and watch any time. Just take a look at the complete list of all recordings.