RE: retest Contribution from Yahoo written on 9/2/2010 at 09:20
Original contribution: retest written by ch.bharath reddy on 8/30/2010 at 09:50) Retest period for developmental batches can be assigned based on lab/trial batches provided there is no major change in process.The developmet batches should be close monitering for stability results.
Answering this Contribution:
|