RE: Validation Master Plan Contribution from Luis Viadel written on 7/23/2004 at 12:21
Original contribution: Validation Master Plan written by H. Martin on 3/21/2002 at 09:40) Any plan can be changed if required and justified. Think about using an Annex with version & change history to manage each validation plan.
Answering this Contribution:
|