RE: RE: PQ Contribution from Stephen Fitzpatrick written on 4/15/2002 at 17:29
Original contribution: RE: PQ written by John taylor on 3/24/2002 at 14:22) In my opinion the ISPE baseline guide on Commissioning and Qualification sees PQ as a link between equipment qualification and process validation. Whereby a complete systems is demonstrated to operate as designed by showing that product of the required quality can be manufactured in the equipment. Answers to this contribution: