Keyword      Search in       

Contact
Imprint
Privacy Policy
Site Map

RSS Feed News. Your shopping cart.

Google gadget.

 

Discussion Forum

 

RE: RE: PQ

Contribution from Stephen Fitzpatrick written on 4/15/2002 at 17:29

Original contribution: RE: PQ written by John taylor on 3/24/2002 at 14:22)

In my opinion the ISPE baseline guide on Commissioning and Qualification sees PQ as a link between equipment qualification and process validation. Whereby a complete systems is demonstrated to operate as designed by showing that product of the required quality can be manufactured in the equipment.

Answers to this contribution:

Answering this Contribution:

    

Name:

E-mail:

re. / topic:

Contribution: